City of Sequin header
File #: 24-188    Version: 1 Name:
Type: Resolution Status: Passed
File created: 4/5/2024 In control: City Council
On agenda: 5/7/2024 Final action: 5/7/2024
Title: Resolution authorizing the City Manager to enter into a Professional Services contract with Kimley-Horn and Associates, Inc. for engineering services related to the design and bidding to up size approximately 9000 linear feet of existing 16-inch and 18-inch with a 36-inch wastewater collection main referred to as the 36-Inch Geronimo Creek Interceptor project; and declaring an effective date - Timothy J. Howe, Director - Water / Wastewater Utilities
Attachments: 1. Council Memo 4-16-2024, 2. Resolution Kimley-Horn 4-16-2024, 3. Seguin_Geronmio Creek Sewer_FeeProposal_KHA_20240402

Title

Resolution authorizing the City Manager to enter into a Professional Services contract with Kimley-Horn and Associates, Inc. for engineering services related to the design and bidding to up size approximately 9000 linear feet of existing 16-inch and 18-inch with a 36-inch wastewater collection main referred to as the 36-Inch Geronimo Creek Interceptor project; and declaring an effective date - Timothy J. Howe, Director - Water / Wastewater Utilities