City of Sequin header
File #: 24-363    Version: 1 Name:
Type: Resolution Status: Passed
File created: 7/26/2024 In control: City Council
On agenda: 8/6/2024 Final action: 8/6/2024
Title: Resolution authorizing the City Manager to enter into a Professional Services contract with TRC Engineers, Inc. for engineering services relocating a 12-inch water main from TxDOT right-of-way and related to the 24-inch Water Transmission Main Project currently under construction; and declaring an effective date - Timothy J. Howe, Director - Water/Wastewater Utilities
Attachments: 1. Council Memo 8-6-2024, 2. Resolution 8-6-2024, 3. 12 Inch Relocated Water Line Engineering Change Order R1

Title

Resolution authorizing the City Manager to enter into a Professional Services contract with TRC Engineers, Inc. for engineering services relocating a 12-inch water main from TxDOT right-of-way and related to the 24-inch Water Transmission Main Project currently under construction; and declaring an effective date - Timothy J. Howe, Director - Water/Wastewater Utilities